
Add to Cart
2016 top quality alloy tube pipe alloy steel pipe manufacturer from China
Item | alloy steel pipe | |
Standard | ASME SA210,ASME SA213,ASTM SA335,ASTMA335/A335m, ASTMA213/A213m,JISG3467-88,JISG3458-88,GB3087,GB6479-2000, | |
GB9948-2006,GB5310-95,GB9948-88,DIN 17175 | ||
Material | GB:Q345,12Cr2Mo,1Cr5Mo,15CrMo,12CrMo | |
DIN:13CrMo44,10CrMo910,12CrMo195,X12CrMo91 | ||
ASTM:ASTM A213 T2,T12,T11,T22,T9,A199 T9 | ||
ASTM A335 P2,P12,P11,P22,P5,P9,A199 T11,A200 T5 | ||
JIS:STBA20,STBA22,STBA23,STBA24,STBA25,STBA26,STPA20, | ||
STPA22,STPA23,STPA24,STPA25,STPA26 | ||
Description | Surface | paint,PE coated,galvanized |
Length | 3m,5.8m,6m, 11.8m,12m, or as required | |
W.T. | 1-200mm | |
O.D. | 6-2500mm | |
Trade terms | Payment term | T/T,L/C at sight,western union |
Price term | FOB,CIF,CFR,CIP | |
Package | Standard export seaworthy package or as required. | |
Delivery time | 3~7 days for ready goods, 20~30 days for new order | |
Application | Alloy steel pipe applies to petroleum,chemical industry,electric power,boiler,high temperature resistant,low temperature resistant, corrosion resistant seamless steel pipe used.Alloy steel pipe also can made according to the customer. | |
1. Personal approach to customer service:
It means that each time you place an order, you will speak to the same customer service representative.
2. Competitive price:
Not the cheapest but the lowest at the same quality
3. Look for sourcing service:
Besides casing and tubing pipe, we can also help customers to find the best other relative steel pipe and pipe fittings.
4. Delivery on time:
According to the quantity, we will make production and delivery plan to guarantee delivery time.
5. Customized:
Small/trail order and mixed order are welcomed.