Hebei Lufeng Piping Equipment Co., Ltd.

Carbon /Alloy steel pipes, ERW steel pipes, API 5L LSAW&SSAW, ASME B16.9/MSS SP-75 BW pipe fittings, ASME B16.5/16.47 steel flanges, ASME B16.11/MSS SP-97 forged fittings, Knife gate valves, Butterfly

Manufacturer from China
Verified Supplier
10 Years
Home / Products / Steel Pipe Fittings /

Forged Brass Threaded Fittings 1/2"-1"

Contact Now
Hebei Lufeng Piping Equipment Co., Ltd.
Visit Website
Province/State:hebei
Country/Region:china
Contact Person:MrSam Cui
Contact Now

Forged Brass Threaded Fittings 1/2"-1"

Ask Latest Price
Video Channel
Place of Origin :Cangzhou, China (Mainland)
Packaging Details :poly bag, inner box,export carton
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Specification

Normal pressure: PN25
Media: water,oil,Non-corrosive and non-combustible gas
Normal temperature: -20℃≤ t ≤150℃
Thread connection Std: ISO228
Material: HPB57-3, CW617N
Surface handling Nickel plated,Chromed plated
Size range: 1/2",3/4",1"

Forged Brass Threaded Fittings 1/2

Production & Inspection steps:

♦ Purchasing the raw material
♦ QC Inspection
♦ Cutting brass bar
♦ PQC Inspection
♦ Forging
♦ PQC Inspection
♦ Heat treated
♦ Sand blasting
♦ PQC Inspection
♦ Machining
♦ PQC Inspection
♦ Assemble parts to full product
♦ Pressure testing
♦ Packing
♦ Delivery

FAQ


Q:We want to forge our logo on the products, so can you do it?
A:Yes,you need to pay a additional charge to us in order to make a new mould.

Q:We have our designs and drawings,can you make it accordingly?
A:Yes,we have over than 15 years OEM experience and have a strong development ability.

Q:What is the leading time for completing the new moulds?
A:We can finish the new moulds in 15-30 days(depends on how complicated the moulds are).

Q:What is the delivery time for goods?
A:25-45 days(according to the quantities).

Q:Can you do the package according to our requirements?
A:Yes,but special package need to be discussed due to the different costs.

Q:Can you send the sample to us for reference?
A:Yes, we can,but the freight should be paid at customer’s costs.

Q:What is the MOQ and MOA?
A:It should be discussed according to the products.Most of the fittings we have the stocks and allow the MOQ to be 100pcs.

Inquiry Cart 0